USS Dallas (SSN 700) Fast Attack Facts
Ships motto for the USS Dallas (SSN 700): First
in Harms Way
- USS Dallas (SSN 700) cost: $860,900,000
- Built by Electric Boat Division of General Dynamics Corporation,
Groton, CT
- Homeport: Groton, CT
- Crew: 12 Officers, 115 Enlisted
- Displacement: Approx. 6,900 tons (6210 metric tons) submerged,
Surfaced: approx. 6,000 tons (note DDS
changes these figures for the USS Dallas)
- Length: 360 feet (109.73 meters)
- Beam: 33 feet (10.06 meters)
- Draft: 32,15 feet (9.8 meters)
- Machinery: 1 pressurized-water S6G (General Electric) reactor;
2 steam turbines; approx 30,000 shp; 1 shaft
- Armament: four 533 mm torpedo tubes for Mk-48 torpedoes, Harpoon
missiles
- We will not post speed due to legal concerns, however the
fine people at ussdallas.com
list their idea of the USS Dallas surfaced and submerged speed
for you. I believe the official statement is something like
"in excess of 25 knots," but this number trends upward
as people accidentally have a slip of the tounge.
Each submarine that is built in the fleet goes through
a building process. A ship must have a contract awarded, they must
build the keel, perform sea trials, then commission the ship. Here
are the associated dates with the USS Dallas (SSN 700).
| USS Dallas (SSN 700) Contract Awarded |
October 31, 1973 |
| Keel Laid |
October 9, 1976 |
| Launched |
April 28, 1978 |
| Commissioned |
July 18, 1981 by CAPT. Donaldl R. Ferrier commanding |
The USS Dallas (SSN 700) is also the first Los Angeles
class submarine to have a dry deck
shelter. The DDS modefications were performed during engineering
refueling overhaul.
T shirts
Poems Books
USS Dallas US
Justice System Thought
Matrix Military Efficiency McDeployment
Shipmates Submarine
faqs
Sea
stories Restriction
War on drugs Rehab
Mission statement
Psych ward Question
authority Resources
Nuclear Power Link
to us
|
|